conform. SQ Let's talk

ISO expertise. Purposeful technology.

Make the standard
your way
of working.

Conform is our platform for business management and ISO requirements. We customise it for every client, connecting processes, machinery and data to the management control room and private AI.

Expertise beside you. Systems built around you. Data under your control.

The audit

Illustrative scenario

  1. Audit: Monday

    Elira: The audit is on Monday. The procedures are in three different folders.

    Quality manager The audit is close. The procedures are spread across different folders.

  2. Genci: Which is the latest version of the instruction?

    Two printed versions of the same instruction, unsigned.

    Production manager There are two versions of one instruction, and nothing shows which one is valid.

  3. Elira: And who approved it? There's no signature.

    Quality manager The approval is missing: nobody knows who signed off the latest version.

  4. Dritan: Will we be ready by Monday?

    Owner The owner can't tell whether the company is ready.

The procedures exist, but the evidence is scattered.

Before the next audit. With Conform.

  1. Documents & evidence

    Elira: Version, approval and evidence: in one place.

    Illustrative screen: the list of procedures with version and status; the work instruction for line 2, version 4 valid, with its approval history and linked evidence.

    Quality manager Every procedure has one valid version, its approval history and linked evidence, in one place.

  2. Genci: On the line we always see the approved version.

    Production manager The line always opens the approved version of the instruction.

  3. Dritan: Ready for the audit?

    Elira: The evidence is ready. The auditor decides.

    Owner · Quality manager The evidence is ready for the auditor. Certification is the certification body's decision.

Processes, documents and evidence in one place. Certification is done by an independent certification body.

The deviation

Illustrative scenario

  1. Quality check

    Ardit: This part is out of tolerance.

    Operator During a check, a part is out of tolerance.

  2. Genci: Write it in the notebook. We'll look at it later.

    Production manager The problem goes into a notebook, with no owner and no deadline.

  3. Three weeks later

    Elira: The same problem again. Who followed it up last time?

    Quality manager Three weeks later, the same problem is back.

  4. Genci: I thought someone else had taken it.

    Production manager Nobody had taken on the follow-up.

The problem gets written down, but nobody owns the follow-up.

The next time. With Conform.

  1. Quality & improvement

    Elira: From report to verification: who, what, by when, with evidence.

    Illustrative screen: deviation 214, part out of tolerance; steps reported, analysed, action and verification; photo and measurement 25.38 mm; corrective action owned by Genci, due Friday; open deviations.

    Quality manager The deviation is tracked step by step, from report to verification, with an owner, a deadline and evidence.

  2. Ardit: I recorded the deviation, with a photo and the measurement.

    Operator The operator records the deviation on the spot, with a photo and the measurement.

  3. Genci: I adjusted the machine and uploaded the evidence.

    Production manager The production manager fixes the cause and uploads the evidence.

Every issue has an owner, a deadline and evidence for closing it.

The machine stops

Illustrative scenario

  1. Line 2, 10:15

    Ardit: The line stopped again.

    Operator Line 2 stops, again.

  2. Ardit: I note it on paper: stoppage, about 20 minutes.

    Operator The stoppage is noted by hand, with a rough time.

  3. End of the week

    Genci: How much time did we lose this week? I have to add it all up by hand.

    Production manager At the end of the week, the notes are added up one by one.

  4. Dritan: Why are the orders late?

    Genci: I don't know for sure.

    Owner · Production manager Orders are late, but nobody knows the cause for sure.

Stoppages happen every day, but the numbers are gathered by hand.

With Conform.

  1. Connected operations

    Genci: Every stoppage, with its time and reason. No paper.

    Illustrative screen: the four lines with their status, line 2 stopped; four edge devices connected; this week's stoppages by reason, material waiting the most frequent; today's events with time, duration and reason.

    Production manager Edge devices record every stoppage and how long it lasted; the reasons come from the operators.

  2. Ardit: I picked the reason: material waiting.

    Operator The operator picks the reason for the stoppage on a tablet.

  3. Dritan: Then we start with the supply side.

    Owner With the most frequent reason in front of him, the owner decides where to act.

The signal comes from the machine, the reason from people, the decision from you. Connecting the equipment is assessed for each project.

The owner's morning

Illustrative scenario

  1. 08:30

    Dritan: Genci, how are we doing on orders?

    Owner The morning starts with phone calls about orders.

  2. Dritan: Elira, any quality problems?

    Owner Then phone calls about quality.

  3. Dritan: Half an hour of calls, and I still don't have the full picture.

    Owner After half an hour, the picture is still incomplete.

  4. Dritan: Should I put the data into an online chatbot?

    Elira: No. That's internal data.

    Owner · Quality manager The idea of a public chatbot stops there: the data is internal.

The information is in many heads and many files.

The next morning. With Conform.

  1. Control room

    Dritan: In five minutes I know where we are and what needs my decision.

    Illustrative control room: 24 orders in progress, 3 issues to look at, 2 late actions, 1 approval waiting; production at 93% of plan; line 2 stopped for 12 minutes; today's priorities with their owners; a summary from the local AI.

    Owner The control room shows orders, production, lines and priorities, with their owners.

  2. Dritan: Why are we at risk of a delay?

    AI: One material is still waiting. A possible cause, to be verified.

    Sources: the order and the supply record.

    Owner Private AI answers with a possible cause and its sources; people make the decision.

  3. Dritan: And our data?

    Elira: It stays here, on our own server.

    Owner · Quality manager The data and the AI stay on the company's own server.

A management view and private AI: answers with sources, data that stays with you.

How we work

ISO is the starting point. A better business is the goal.

The platform

Conform is the base. The solution is yours. We build what your way of working needs, even when the feature doesn't exist yet.

AI and deployment

Classification, access and routing are designed and tested for each project. There is no automatic cloud fallback for sensitive requests.

How we start

  1. 1

    A conversation

    What matters to you, which standard, which process.

  2. 2

    One pilot process

    We pick one question with value, e.g. where we lose production time.

  3. 3

    Building

    We tailor Conform to it and test it with your team.

  4. 4

    Growing

    A new department, a new process, another ISO standard.

Let's talk

Tell us about your business: which standard, which process, what you want to control better.

Privacy

The form stores only what you write in it, with the date and the page language. We use it only to contact you about this request. It passes through Cloudflare, which protects this site, and is stored on our own server. We don't share it with anyone else. To see or delete it, write to us through this form. This site uses no tracking. The scenarios and views on this page are illustrative.

Let's talk